In July 2025 the European Commission and PIC/S published a draft revision of EU GMP Annex 11, the guidance on computerised systems, alongside a revised Chapter 4 (Documentation) and a new Annex 22 on artificial intelligence. The current Annex 11 is five pages long and dates from 2011. The draft runs to 19 pages and turns many long-standing inspection expectations into explicit requirements.
It is still a draft. The consultation closed on 7 October 2025, and at the time of writing the 2011 version remains the one in force, with no final text or date of application published. But the direction is clear, and laboratories that start now will find the final version far easier to absorb.
Does it apply to my laboratory?
- GMP quality control laboratories: yes, directly. Annex 11 applies to computerised systems used in manufacturing medicinal products and active substances, which includes QC testing and release.
- GLP and GCLP laboratories: not directly. GLP laboratories follow OECD GLP Advisory Document No. 17 on computerised systems, and clinical laboratories follow GCP and the EMA guideline on computerised systems in clinical trials. In practice, though, Annex 11 is widely used as a benchmark by auditors and sponsors, so its expectations tend to spread.
The short answer
- Much more prescriptive. Expectations that were implied or left to risk assessment are now spelled out, from password rules to audit trail review.
- Audit trails are no longer optional. Systems where users can create, change or delete data should log all manual interactions, and reviews must be procedural, risk-based and done by someone independent.
- Identity and access management gets its own section, with unique accounts, segregation of duties and multifactor authentication for remote access.
- Suppliers and SaaS are covered in detail. You stay fully responsible for systems run by vendors, service providers or your own IT department.
- Cybersecurity is explicit: patching, unsupported platforms, firewalls, penetration testing and restore tests.
What changes for laboratory systems
| Area | What the draft expects | Typical laboratory impact |
|---|---|---|
| User accounts | Unique, personal accounts; shared accounts only for read-only access | Shared logins on instrument PCs and chromatography data systems need to go |
| Roles | Segregation of duties and least privilege: GMP users should not hold administrative rights | Analysts with admin access to their own instrument software |
| Audit trails | Who, what, when and why for every manual change, enabled and locked at all times | Older standalone instrument software may not comply |
| Audit trail review | Documented procedure, risk-based, reviewed by someone not involved in the work, before release | A defined, recorded review step in result approval |
| Data transfer | Validated interfaces rather than manual transcription where possible (instrument to LIMS is the example given) | Transcription from instruments into LIMS or spreadsheets |
| Data copies | A complete, searchable electronic copy including audit trail; flat, locked files are not acceptable | PDF-only exports used as the record |
| Access security | Lockout after failed attempts, inactivity logout, access logs, MFA for remote access | Remote vendor support and home access to LIMS |
| Platforms | Supported, patched operating systems; controls where platforms are unsupported | Instrument PCs on old Windows versions |
| Periodic review | A defined scope, including changes, audit trail and access reviews, backups and supplier performance | Periodic reviews that only check the change log |
Suppliers, SaaS and your IT department
The draft is direct about outsourcing: relying on a vendor’s validation, a cloud provider or an internal IT team does not change the requirements, and the regulated user remains fully responsible. Expect to need:
- an audit or thorough assessment of suppliers, scaled to risk, and a decision on what of their work you can rely on
- your own approved requirements for the implemented system, even if the vendor supplied a starting point
- contracts or IT procedures covering service levels, incident reporting, inspection support, release of new versions and an exit strategy that keeps your data under your control
- the ability to explain supplier documentation from your own site
For SaaS LIMS, ELN and QMS platforms this is the area most likely to need work, particularly vendor release processes and exit plans.
What to do now
- Inventory your systems and rank them by impact on results and data integrity.
- Run a gap assessment of the highest-risk systems against the draft, starting with access, audit trails and data transfer.
- Fix the quick wins: shared accounts, admin rights for analysts, missing inactivity logouts.
- Write or update your audit trail review procedure so it says who reviews what, when and how it is recorded.
- Plan for legacy instruments that cannot meet the requirements: upgrades, compensating controls or replacement, with a documented risk assessment.
- Review supplier agreements for SaaS and hosted systems.
None of this is wasted if the final text changes. Most of it reflects what inspectors already look for under the current Annex 11 and data integrity guidance.
How we can help
We carry out gap assessments of laboratory computerised systems against the draft Annex 11, help prioritise remediation for legacy instruments, write practical audit trail review and access management procedures, and assess SaaS suppliers. For GLP and GCLP laboratories we map the draft’s expectations to OECD and GCP requirements, so you invest once and meet both.