Computerised system validation (CSV) demonstrates, with documented evidence, that a system is fit for its intended use and stays that way. In clinical research and regulated laboratories that covers systems such as LIMS, instrument and data acquisition software, clinical trial and delegation systems, eQMS and document management platforms, and the spreadsheets, integrations and reporting tools between them.

We take a practical, risk-based approach aligned with ICH E6(R3), the EMA guideline on computerised systems and electronic data in clinical trials, OECD GLP guidance, GAMP 5 (Second Edition), EU Annex 11 and 21 CFR Part 11. Effort is focused on the functions that matter for patient safety, data integrity and study or product quality, and supplier evidence is used wherever it is reliable. The aim is a defensible validation story, from intended use to risk, evidence, approval and ongoing control, that your team can explain at inspection and maintain afterwards.

Support ranges from a single deliverable, such as a validation plan, supplier assessment or protocol set, to end-to-end lifecycle delivery or independent review of validation work done by others.

When to get in touch

  • You are implementing or upgrading a GCP or GLP system
  • An existing system was never validated properly
  • Your validation packs are too heavy to maintain
  • You need an independent review before inspection
Discuss your situation

What's included

  • Validation strategy and planning
  • User requirements (URS) and requirements traceability
  • Supplier assessment and system risk assessment
  • IQ / OQ / PQ and UAT protocols, scripts and execution
  • Deviation management and validation reporting
  • Change control, periodic review and decommissioning
  • CSV governance, SOPs and system inventories

Typical deliverables

  • Validation plans
  • User requirements specifications
  • Supplier assessments
  • Risk assessments
  • Protocols and test scripts
  • Traceability matrices
  • Validation reports
  • SOPs and work instructions
  • Periodic review reports
  • Decommissioning records

Regulations and standards

  • ICH E6(R3) GCP
  • EMA guideline on computerised systems and electronic data in clinical trials
  • OECD GLP Advisory Document No. 17
  • GCLP
  • GAMP 5 (Second Edition)
  • EU Annex 11 (revision in draft)
  • 21 CFR Part 11
  • ALCOA++
  • FDA Computer Software Assurance
  • GMP
Approach

Support at every stage, from concept to retirement

Full lifecycle delivery, or independent review at the points where you need it.

  1. 01

    Discover

    System context, intended use, stakeholders and regulatory impact.

  2. 02

    Define

    URS, scope, validation strategy and acceptance criteria.

  3. 03

    Assess

    Supplier, system, process and data integrity risk assessment.

  4. 04

    Validate

    Protocol development, execution, deviation management and traceability.

  5. 05

    Release

    Validation report, QA approval and go-live readiness.

  6. 06

    Maintain

    Change control, periodic review, audit trail review and retirement.

Recent work

Case studies

Anonymised to protect client confidentiality.

Client feedback

What clients say

Joe brings a level of clarity, structure and foresight that transforms how you approach compliance. This is some of the best consulting money a company operating in a highly regulated environment can spend. The standards, frameworks and practical tools he leaves behind will continue to deliver value for many years.

Head of Data ScienceUK clinical research organisation

Working with Turton Consulting is giving us confidence in our regulatory compliance for computerised systems used in clinical trials. Their structured and collaborative approach not only closed the gaps, but strengthened our overall documentation framework. I would highly recommend them to any organisation looking to strengthen their clinical trial computer systems compliance.

QA ManagerUK clinical research organisation

Feedback from 2 people at a UK clinical research organisation, shared with permission and anonymised to protect client confidentiality.

FAQ

Computerised System Validation: common questions

How much validation does a system need?

It depends on the system's intended use and risk. A system that generates or stores GxP-critical data, or supports decisions affecting participant safety or study results, needs more rigorous evidence than one with indirect impact. A documented risk assessment sets the scope, so effort goes where it matters and can be justified at inspection.

Can we rely on our supplier's validation documentation?

Supplier evidence can and should be used where it is reliable, but it does not replace your own validation. You still need to define intended use, assess the supplier, verify your configuration and processes, and show the system is suitable for how you use it. A supplier assessment determines how much of their evidence you can rely on.

Do spreadsheets need validating?

Spreadsheets used to calculate, store or report GxP data are computerised systems and need proportionate controls: defined intended use, verified formulas, protection against unauthorised change, and version control. Many inspection findings relate to uncontrolled spreadsheets, so they are worth including in your system inventory.

What happens after go-live?

Validation is maintained, not finished. Change control, periodic review, access reviews, audit trail review and incident management keep the system in a validated state until it is retired and its data is preserved.

Discuss your validation project

Tell us a little about your system or situation and we'll suggest a proportionate approach.

Fields marked * are required.

We use your details only to reply to your enquiry. See our privacy policy.

Typically answered within 1–2 working days. Prefer email? [email protected]